DetailsDetails for this assignment can be found here. Lab deliverablesDue by the beginning of week 7 lecture 1A proposed lab project must be submitted via email by the beginning of class on Monday of week 7. If you plan to work with a partner, only one submission is required for you and your partner (be sure to include both names in the email). Due at the end of labEach student must demonstrate the program working on their microcontroller by the end of lab. Due at 11pm the day of week 7 labEach student must submit their source file(s). Standard documentation for your code is required. You should include a complete description of your project in the documentation of the source file that contains your main function. In addition, each student must indicate how much time was spent on this assignment in the FAST system. The log should indicate the amount of time spent on this assignment (in minutes). All time spent on this assignment should be entered into the week 7 column. |