SE2030 -- Lab 4: ATM application - Use Cases

Overview

The assignment is located here. However, you should follow the submission guidelines given on this page.

Group Assignment

For the first week of the assignment, students will work in their assigned pairs.

For the second week of the assignment, student will be placed in groups of three or four. The group must choose a common subversion repository for their files related to this project.

Each student must write two use cases and review two use cases written by other members of his/her group. Each use case must be committed to the repository before and after being review. Be sure to add comments to the commit log to make it clear when the review has taken place.

FAST (due 11:00pm, the day prior to weeks 6 and 7 lab)

Enter the overall time you spent each week on this lab assignment into the FAST system (for weeks 5 and 6). The time entered in the week 5 column should include all time spent on the project from the day the project was assigned up to the week 6 lab session. The remaining time spent on the project should be recorded in the week 6 column.

Repository Commits (due 11:00pm, the day prior to weeks 6 and 7 lab)

Follow the instructions on the detailed assignment page.

Acknowledgment

This laboratory was developed by Dr. Mark Hornick.

  • © 2001-2015 Dr. Christopher C. Taylor •
  • Office: L-343 •
  • Phone: 277-7339 •
  • npǝ˙ǝosɯ@ɹolʎɐʇ